<!-- Generated for AI assistants. Canonical HTML: http://ztvpower.com:443/en -->

# 125kW/261kWh BESS

125kW / 261kWh LFP battery energy storage system — about two hours of discharge, for villages, telecom sites, small parks and retail chains.

The 125kW / 261kWh BESS pairs a 125kW-class storage inverter with a 261kWh LFP battery cabinet, switching automatically between grid-tied peak shaving, off-grid supply and backup, with multi-unit paralleling for larger sites. PCS, battery and EMS are commissioned and tested before shipment, so the work on site is limited to AC termination and grid acceptance — the standard configuration for village supply, telecom back-up, small parks and retail chains needing around two hours of autonomy.
